HYBRID VEHICLE TRANSAXLE UNIT INSPECTION

PROCEDURE


  1. INSPECT INPUT SHAFT ASSEMBLY END PLAY


    1. A005B19E01

      Using a SST and dial indicator, measure the input shaft assembly end play.

      SST
      09951-01600
      Standard end play
      0.10 to 0.20 mm (0.00394 to 0.00787 in.)

      If the value is not as specified, replace the planetary sun gear snap ring with one of the correct thickness.

  2. INSPECT NO. 1 REAR PLANETARY GEAR ASSEMBLY


    1. A005BTN

      Using a feeler gauge, measure the clearance between the No. 1 rear planetary gear assembly and the pinion gear.

      Standard clearance
      0.11 to 0.91 mm (0.00433 to 0.0358 in.)

      If the value is not as specified, replace the No. 1 rear planetary gear assembly.