TCM INSTALLATION
PROCEDURE
INSTALL TCM
Install the TCM to the transaxle.
-
Install and tighten the 2 bolts in the order shown in the illustration.
11.3 N*m
115 kgf*cm
8 ft.*lbf
-
Connect the connector to the TCM.
Turn the lock lever until the claw of the connector makes a connection sound and secure the connector with the lock lever.
INSTALL BATTERY BRACKET REINFORCEMENT
INSTALL BATTERY BRACKET FRONT
INSTALL BATTERY TRAY
INSTALL BATTERY
INSTALL BATTERY INSULATOR
INSTALL BATTERY CLAMP SUB-ASSEMBLY
CONNECT CABLE TO POSITIVE BATTERY TERMINAL
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click hereClick hereClick hereClick hereClick hereClick here).