AIR SWITCHING VALVE(for Bank 2) INSTALLATION
PROCEDURE
INSTALL AIR SWITCHING VALVE ASSEMBLY
-
*1
No. 3 Air Tube
*2
Air Switching Valve
*3
Claw
Install a new gasket and the air switching valve with the 3 bolts.
24 N*m
245 kgf*cm
18 ft.*lbf
Note:Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.
Install the 2 bolts.
10 N*m
102 kgf*cm
7 ft.*lbf
Connect the wire harness clamp bracket with the bolt.
8.0 N*m
82 kgf*cm
71 in.*lbf
Attach the wire harness clamp and connect the air switching valve connector.
-
CONNECT NO. 1 AIR INJECTION SYSTEM HOSE
-
*1
Projection
*2
Paint Mark
Align the paint mark with the projection and connect the No. 1 air injection system hose.
Tip:Make sure the direction of the hose clamp is as shown in the illustration.
-
CONNECT NO. 3 VENTILATION HOSE
-
*1
Paint Mark
*a
Front
Connect the No. 3 ventilation hose.
Tip:The direction of the hose clamp is indicated in the illustration.
-
INSTALL AIR CLEANER CAP AND HOSE
INSTALL V-BANK COVER SUB-ASSEMBLY
INSTALL ENGINE ROOM SIDE COVER