STARTER INSTALLATION

PROCEDURE

  1. INSTALL FLYWHEEL HOUSING SIDE COVER

    1. Install the flywheel housing side cover to the cylinder block.

  2. INSTALL STARTER ASSEMBLY

    1. Install the starter with the 2 bolts.

      37 N*m

      380 kgf*cm

      27 ft.*lbf

    2. Connect the connector.

    3. Connect the starter wire with the nut.

      9.8 N*m

      100 kgf*cm

      87 in.*lbf

    4. Close the terminal cap.

  3. INSTALL BATTERY CARRIER

  4. INSTALL BATTERY TRAY

  5. INSTALL BATTERY

  6. INSTALL BATTERY CLAMP SUB-ASSEMBLY

  7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  8. INSTALL NO. 1 ENGINE UNDER COVER

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  10. INSTALL RADIATOR SUPPORT OPENING COVER

  11. INSTALL NO. 2 CYLINDER HEAD COVER