SHIFT LEVER ASSEMBLY INSTALLATION

PROCEDURE

  1. INSTALL SHIFT LEVER ASSEMBLY

    1. C207445

      Install the shift lever assembly with the 4 nuts.

      12 N*m

      122 kgf*cm

      9 ft.*lbf

  2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

    1. C210227

      Attach the 2 claws and connect the control cable assembly to the shift lever assembly.

      Note:

      Make sure that the claws are firmly engaged.

    2. C208202E04

      Connect the control shift cable to the shift lever assembly.

      Table 1. Text in Illustration

      *1

      Select Cable

      *2

      Shift Cable

    3. Connect the control select cable to the shift lever assembly.

  3. ADJUST CONTROL SELECT CABLE

    1. Adjust the control select cable (Click here).

  4. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

  5. INSTALL FRONT NO. 2 CONSOLE BOX INSERT

  6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT

  7. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL

  8. INSTALL SHIFTING HOLE COVER

  9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

  10. INSTALL STEREO OPENING COVER WITH BRACKET (w/o Audio)

  11. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Audio)

  12. INSTALL RADIO RECEIVER ASSEMBLY (w/ Audio)

  13. INSTALL CENTER INSTRUMENT PANEL REGISTER ASSEMBLY

  14. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

  15. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

  16. INSTALL BOX PANEL SUB-ASSEMBLY

    1. Install the box panel sub-assembly (Click here).