FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE

  1. INSTALL TIMING CHAIN COVER OIL SEAL

    1. Apply MP grease to the lip of a new timing chain cover oil seal.

      Note:

      Keep the lip free of foreign matter.

    2. A196141N05

      Using SST and a hammer, tap in the timing chain cover oil seal until its surface is flush with the timing chain cover sub-assembly.

      09223-22010

      Note:
      • Do not tap in the timing chain cover oil seal at an angle.

      • Wipe off excess grease from the crankshaft.

      Tip:

      Timing chain cover oil seal tap in depth: -0.5 to 1.0 mm (-0.0197 to 0.0394 in.)

  2. INSTALL CRANKSHAFT PULLEY

    1. A293260C01

      *a

      Hold

      V100135

      Turn

      Align the pulley set key with the key groove of the crankshaft pulley, then install the crankshaft pulley.

    2. Using SST, install the crankshaft pulley bolt.

      09960-10010

      09962-01000

      09963-01000

      128 N*m

      1305 kgf*cm

      94 ft.*lbf

  3. INSTALL V-RIBBED BELT

  4. INSPECT FOR OIL LEAK

  5. INSTALL REAR ENGINE UNDER COVER RH

  6. INSTALL FRONT WHEEL RH

    103 N*m

    1050 kgf*cm

    76 ft.*lbf