INTAKE MANIFOLD INSPECTION


  1. INSPECT INTAKE MANIFOLD

    B007SO4

    Note

    Do not adjust the adjusting screw or 2 actuator installation bolts.


    1. B007ORG

      Check the operation of the swirl control valve.


      1. Check that the valve is fully opened under normal conditions.

      2. Connect a vacuum pump to the control valve. Check that the valve is fully closed when a negative pressure of 66.7 kPa (500 mmHg, 19 in.Hg) is applied.

      3. Leave it for 1 minute and check that the vacuum pump needle does not move. If the result is not as specified, replace the intake manifold.

  2. INSPECT VACUUM SWITCHING VALVE


    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 33 to 39 Ω

      1 - Body ground

      2 - Body ground

      20°C (68°F) 10 kΩ or higher

      If the result is not as specified, replace the intake manifold.

    2. Check the operation according to the value(s) in the table below.


      1. B007POUE09
        Text in Illustration
        *a Port E
        *b Filter
        B007USN Airflow

        Check that air flows from port E to the filter. If the result is not as specified, replace the intake manifold.

      2. Apply battery voltage across the terminals.

      3. B007OEZE10
        Text in Illustration
        *a Port E
        *b Port F
        B007USN Airflow

        Check that air flows from port E to port F. If the result is not as specified, replace the intake manifold.