AIR SWITCHING VALVE(for Bank 1) REMOVAL

PROCEDURE

  1. REMOVE V-BANK COVER SUB-ASSEMBLY

  2. REMOVE ENGINE ROOM SIDE COVER LH

  3. DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE

    1. A233239

      Disconnect the air switching valve connector.

    2. Disconnect the No. 2 air injection system hose.

  4. REMOVE AIR SWITCHING VALVE ASSEMBLY

    1. A233240

      Remove the bolt and disconnect the wire harness clamp bracket.

    2. A233241

      Remove the 2 bolts.

    3. A233242

      Remove the 3 bolts, air switching valve and gasket.

      Note:

      Be careful not to damage the surfaces that contact the gasket.