INSTALL STARTER ASSEMBLY
A/T:
Connect the ground cable and install the starter with the 2 nuts and bolt.
Tech Tips
Make sure to connect the ground cable with the nut as shown in the illustration.
M/T:
Install the starter and ground cable with the nut and bolt.
Tech Tips
Make sure to connect the ground cable with the nut as shown in the illustration.
Install the starter wire to terminal 30 with the nut.
Connect the starter connector.
for A340F A340E:
Install transmission oil filler tube sub-assembly.
Coat a new O-ring with ATF, and install it to the transmission oil filler tube sub-assembly.
Install the oil filler tube with the 2 bolts.
Install the oil dipstick.
CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission)
Install the release cylinder with the 2 bolts.
INSTALL FRONT FENDER SEAL
Install the seal with the 5 clips.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.