NETWORK GATEWAY ECU INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for RHD and LHD vehicles.

  • The procedure listed below is for LHD vehicles.

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. B006B86C01
      *a Lock Part
      *b Guide Part
      *c Passenger Side Junction Block Assembly Claw
      *d Protrusion of the Network Gateway ECU
      *e Check that it is securely installed
      B006BJ7 Pressing Area
      B006DHE Install in this Direction

      Align the guide and attach the claw to install the network gateway ECU.

      Note


      • For the lock, make sure that the claw of the passenger side junction block assembly goes over the protrusion of the network gateway ECU.

      • For the guide, make sure that the network gateway ECU is securely installed to the passenger side junction block assembly.

  2. INSTALL PASSENGER SIDE JUNCTION BLOCK ASSEMBLY WITH NETWORK GATEWAY ECU


    1. Attach the claw to connect the 2 lever connectors.

      Note

      Be sure to connect the lever connector securely.

      B006A3LC01
      *a Lever Connector - -
      B006DHE Rotate in this Direction - -
    2. Connect the connector.

    3. Attach the claw.

    4. B006F4LC01
      *a Nut (A)
      *b Nut (B)

      w/ VGRS:


      1. Install the nut (A).

        Note

        If the removed nut is the same shape as that shown in the illustration, replace it the supplied replacement part.

        B006G7H
        Torque:
        8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    5. w/o VGRS:


      1. Install the nut (A) and nut (B).

        Note

        If the removed nut is the same shape as that shown in the illustration, replace it the supplied replacement part.

        B006G7H
        Torque:
        8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    6. Connect the 2 connectors.

      B006DDKC01
      *a Lever Connector - -
      B006DHE Rotate in this Direction - -
    7. Attach the claw to connect the 2 lever connectors.

      Note

      Be sure to connect the lever connector securely.

    8. B006BXB

      Connect the 3 connectors.

    9. Attach the clamp.

  3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (w/o VGRS)

    Click here

  4. INSTALL GLOVE COMPARTMENT DOOR PAD PLATE (w/o VGRS)

    Click here

  5. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY WITH AIR CONDITIONING CONTROL ASSEMBLY (w/o VGRS)

    Click here

  6. INSTALL LOWER NO. 1 INSTRUMENT PANEL PAD SUB-ASSEMBLY (w/o VGRS)

    Click here

  7. INSTALL INSTRUMENT SIDE PANEL LH (w/o VGRS)

    Click here

  8. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY (w/o VGRS)

    Click here

  9. INSTALL FRONT STEERING CONTROL ECU (w/ VGRS)

    Click here