LIGHT CONTROL RHEOSTAT INSTALLATION

PROCEDURE

  1. INSTALL LIGHT CONTROL RHEOSTAT

    1. Attach the 2 claws to install the light control rheostat to the fuse box opening cover.

  2. INSTALL FUSE BOX OPENING COVER