VACUUM REGULATING VALVE INSTALLATION

PROCEDURE

  1. INSTALL VACUUM REGULATING VALVE ASSEMBLY

    1. Install the vacuum regulating valve assembly to the No. 2 vacuum switching valve bracket with the 2 bolts.

      10 N*m

      102 kgf*cm

      7 ft.*lbf

    2. Connect the No. 3 vacuum transmitting hose assembly and No. 4 vacuum transmitting hose assembly to the vacuum regulating valve assembly.

    3. Connect the vacuum regulating valve assembly connector.

  2. INSTALL OUTER COWL TOP PANEL (for LHD)

  3. INSTALL OUTER COWL TOP PANEL (for RHD)

  4. INSTALL NO. 2 HEATER AIR DUCT SPLASH SHIELD SEAL (for LHD)

  5. INSTALL NO. 2 HEATER AIR DUCT SPLASH SHIELD SEAL (for RHD)

  6. INSTALL WATER GUARD PLATE LH (for LHD)

  7. INSTALL WATER GUARD PLATE LH (for RHD)

  8. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY