ACTIVE CONTROL ENGINE MOUNT(for Front Side) INSTALLATION

PROCEDURE


  1. INSTALL FRONT ENGINE MOUNTING INSULATOR


    1. Install the stay to the front engine mounting insulator with the nut.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    2. Install the front engine mounting insulator to the front frame assembly with the 3 nuts.

      Torque:
      72 N*m  { 734 kgf*cm, 53 ft.*lbf }
    3. B0083PQN01

      Install the front engine mounting bracket to the transaxle housing with the 3 bolts.

      Torque:
      Bolt (A), (B) and (C)
      42 N*m  { 428 kgf*cm, 31 ft.*lbf }

      Note

      Temporarily tighten the bolt (A), and then fully tighten the 3 bolts in the order of (B), (C) and (A).

    4. Install the front engine mounting bracket to the front engine mounting insulator with the bolt.

      Torque:
      Bolt (D)
      72 N*m  { 734 kgf*cm, 53 ft.*lbf }
    5. Connect the vacuum hose to the front engine mounting insulator.

    6. Engage the 2 clamps to install the vacuum hoses to the front engine mounting insulator.

  2. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  3. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH

    Click here

  4. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH

    Click here

  5. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  6. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System)

    Click here