GENERATOR (for DENSO Made) INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY

    A01DZD9

    1. Install the generator bar with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    2. Install the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Connect the generator connector.

  2. INSTALL DRIVE BELT

    A01DVM8E01

    1. While turning the belt tensioner counterclockwise, align its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.

    2. Install the V-ribbed belt.

    3. While turning the belt tensioner counterclockwise, remove the bar.

    4. A01DVGME02

      If it is hard to install the V-ribbed belt, perform the following procedure.


      1. Put the V-ribbed belt on everything except the P/S pump as shown in the illustration.

      2. While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.

  3. INSTALL V-BANK COVER

    A01DVM8E01

    1. While turning the belt tensioner counterclockwise, align its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.

    2. Install the V-ribbed belt.

    3. While turning the belt tensioner counterclockwise, remove the bar.

    4. A01DVGME02

      If it is hard to install the V-ribbed belt, perform the following procedure.


      1. Put the V-ribbed belt on everything except the P/S pump as shown in the illustration.

      2. While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  5. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.