SHIFT LEVER ASSEMBLY INSTALLATION
PROCEDURE
INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY
Install the floor shift shift lever assembly with the 4 bolts.
12 N*m
122 kgf*cm
9 ft.*lbf
for LHD:
Attach the 2 wire harness clamps.
for RHD:
Attach the 3 wire harness clamps.
CONNECT TRANSAXLE CONTROL CABLE ASSEMBLY
ADJUST TRANSAXLE CONTROL CABLE ASSEMBLY
Adjust control cable.
For new shift lever:
Remove the stopper pin and dispose of it.
INSTALL REAR CONSOLE BOX SUB-ASSEMBLY