GENERATOR INSTALLATION
PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the wire harness clamp bracket with the bolt.
8.4 N*m
85 kgf*cm
74 in.*lbf
Temporarily install the generator assembly with the bolt.
Temporarily install the adjusting bar with the 2 bolts.
-
Tighten the bolt.
25 N*m
255 kgf*cm
18 ft.*lbf
Install the wire harness to terminal B with the nut and install the terminal cap.
9.8 N*m
100 kgf*cm
87 in.*lbf
Connect the connector and attach the wire harness clamp.
INSTALL V-RIBBED BELT
ADJUST V-RIBBED BELT
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
INSPECT V-RIBBED BELT
INSTALL REAR ENGINE UNDER COVER RH
INSTALL NO. 2 CYLINDER HEAD COVER
INSTALL RADIATOR SUPPORT OPENING COVER