GLOW PLUG CONTROLLER (for DPF) INSTALLATION


  1. INSTALL NO. 2 GLOW PLUG CONTROLLER BRACKET


    1. Install the No. 2 glow plug controller bracket to the glow plug controller with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL NO. 1 GLOW PLUG CONTROLLER BRACKET


    1. Install the No. 1 glow plug controller bracket to the glow plug controller with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL GLOW PLUG CONTROLLER


    1. for LHD:

      Install the glow plug controller with the nut and bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      for RHD:

      Install the glow plug controller with the 2 nuts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 4 connectors and clamp.

  4. INSTALL BATTERY AND BATTERY TRAY

  5. INSTALL BATTERY BRACKET

  6. CONNECT CABLE TO BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.