BLOWER UNIT INSTALLATION


  1. INSTALL BLOWER UNIT


    1. B007S32

      Install the wire harness with the screw. (w/ PTC)

    2. B007QJAE03

      Install the blower unit with the 4bolts.

    3. Install the 2 clamps and 2 connectors.

    4. Install the 2 connectors. (w/ PTC)

    5. B007ULZ

      Install the junction block with the nut. (body type narrow)

    6. B007QE9

      Install the junction block with the 2 nuts.(RHD)

  2. INSTALL AIR DUCT NO.2


    1. B007QVDE01

      Engage the 2 claws to install the air duct No.2.

  3. INSTALL STEERING COLUMN ASSEMBLY

    Click here

  4. INSTALL INSTRUMENT PANEL ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  6. PERFORM INITIALIZATION

    Tech Tips

    Some systems need initialization when disconnecting the cable from the negative battery terminal. Click here