VACUUM REGULATING VALVE (w/o EGR Cooler) INSTALLATION


  1. INSTALL VACUUM SWITCHING VALVE (for EGR CUT)

    A01DWOF

    1. Install the valve with the bolt.

      Torque:
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
  2. INSTALL VACUUM SWITCHING VALVE BRACKET


    1. A01DWGJ

      Install the bracket with the 2 bolts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    2. Connect the vacuum hoses to the 3 locations.

    3. Connect the 2 connectors.

  3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


    1. A01DYO3

      Install the cover with the 3 bolts and 2 nuts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  5. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      CAUTION:

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.