ROOF DRIP SIDE FINISH MOULDING(for Sedan) INSTALLATION
CAUTION / NOTICE / HINT
Use the same procedure for the RH and LH sides.
The procedure described below is for the LH side.
PROCEDURE
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
Note:When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with non-residue solvent.
-
*a
Adhesive
*b
2 to 3 mm Bead of Adhesive
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.
Tip:Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
-
*a
Protruding Part
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
Table 1. Standard Dimension Dimension
Measurement
A
2.9 mm (0.114 in.)
B
4.8 mm (0.189 in.)
C
1.5 mm (0.0591 in.)
D
2.2 mm (0.0866 in.)
E
4.1 mm (0.161 in.)
F
4.0 mm (0.157 in.)
G
1.3 mm (0.0512 in.)
H
3.8 mm (0.150 in.)
Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.
Tip:Initial hardening time: 20 minutes
Complete hardening time: 48 hours
-
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING
-
Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.
-