TURBOCHARGER INSTALLATION
CAUTION / NOTICE / HINT
Before installing the turbocharger sub-assembly, be sure to read Maintenance Precaution.
PROCEDURE
INSTALL STUD BOLT
Tip:If a stud bolt is deformed or the threads are damaged, replace it.
-
*1
Stud Bolt (A)
*2
Stud Bolt (B)
Using an E10 "TORX" socket wrench, install the 4 stud bolts (A) to the turbocharger sub-assembly.
19.5 N*m
199 kgf*cm
14 ft.*lbf
Using an E6 "TORX" socket wrench, install the 2 stud bolts (B) to the turbocharger sub-assembly.
5.0 N*m
51 kgf*cm
44 in.*lbf
-
INSTALL TURBOCHARGER SUB-ASSEMBLY
-
*a
Claw
Install a new outlet compressor gasket to the turbocharger sub-assembly.
Tip:Make sure that the claws of the outlet compressor gasket are facing the turbocharger sub-assembly.
-
Temporarily install the turbocharger sub-assembly to the cylinder head sub-assembly with the 3 bolts.
-
*a
Claw
Install a new inlet turbo oil gasket to the inlet turbo oil pipe sub-assembly.
Note:Make sure that the inlet turbo oil gasket is installed in the correct direction.
Tip:Make sure that the claws of the inlet turbo oil gasket are facing the inlet turbo oil pipe sub-assembly.
-
*a
Claw
Install a new outlet No. 1 turbo oil gasket to the stiffening crankcase assembly.
Tip:Make sure that the claws of the outlet No. 1 turbo oil gasket are facing the stiffening crankcase assembly.
-
*1
Union Bolt
*2
Bolt (A)
*3
Bolt (B)
Install a new gasket to the union bolt.
Temporarily install the inlet turbo oil pipe sub-assembly to the turbocharger sub-assembly and cylinder block sub-assembly with the 2 bolts (A) and union bolt.
-
Tighten the 3 bolts in the order shown in the illustration.
35 N*m
357 kgf*cm
26 ft.*lbf
Tighten the 2 bolts (A).
12 N*m
122 kgf*cm
9 ft.*lbf
Temporarily tighten the union bolt.
Temporarily install the 2 bolts (B).
Tighten the union bolt.
36 N*m
367 kgf*cm
27 ft.*lbf
Note:If the link that connects the gaskets is broken, remove the link by using side cutters or a similar tool.
Tighten the 2 bolts (B).
12 N*m
122 kgf*cm
9 ft.*lbf
Connect the air by-pass valve assembly connector.
-
CONNECT NO. 1 TURBO WATER PIPE SUB-ASSEMBLY
Set a new water by-pass gasket.
Temporarily install the No. 1 turbo water pipe sub-assembly with the 2 nuts.
Temporarily install the bolt.
-
Tighten the 2 nuts and bolt in the order shown in the illustration.
12 N*m
122 kgf*cm
9 ft.*lbf
INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY
ADD ENGINE OIL
INSPECT FOR ENGINE OIL LEAK
CHECK ENGINE OIL LEVEL