COMBINATION METER INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION METER ASSEMBLY


    1. Connect the 2 connectors.

    2. Engage the 2 guides and 2 clips to install the combination meter assembly..

    3. Install the 2 screws.

  2. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }