PROCEDURE
INSPECT STARTER RELAY (ST)
Measure the resistance according to the value(s) in the table below.
Standard Resistance | ||||||||
---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the starter relay.
INSPECT STARTER RELAY (ST NO. 2)
Measure the resistance according to the value(s) in the table below.
Standard Resistance | ||||||||
---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the starter relay.