FRONT CONSOLE BOX(for Hatchback, Wagon) INSTALLATION
PROCEDURE
INSTALL REAR CONSOLE BOX ASSEMBLY
-
Engage the 4 guides as shown in the illustration.
for Manual Transaxle:
Install the rear console box assembly with the 2 bolts and 2 screws.
for CVT:
Install the rear console box assembly with the 2 bolts and 4 screws.
-
INSTALL CONSOLE BOX CARPET
Install the console box carpet.
INSTALL REAR CONSOLE BOX COVER (w/o Power Outlet Socket)
Install the rear console box cover.
INSTALL UPPER CONSOLE PANEL
-
Engage the 2 claws, 5 clips and 2 guides to install the upper console panel as shown in the illustration.
-
Engage the clamp.
-
INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
Connect each connector.
-
Engage the 4 claws and 5 clips to install the upper console panel sub-assembly.
INSTALL SHIFTING HOLE BEZEL (for CVT)
Engage the 2 guides.
Engage the 6 claws to install the shifting hole bezel.
INSTALL SHIFTING HOLE BEZEL (for Manual Transaxle)
Engage the 2 guides.
Engage the 6 claws to install the shifting hole bezel.
INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)
-
Turn the shift lever knob sub-assembly clockwise and install the shift lever knob sub-assembly.
-
INSTALL FRONT NO. 2 CONSOLE BOX INSERT
-
*a
Guide <A>
*b
Guide <B>
Push the front No. 2 console box insert in the direction indicated by the arrow (1) to engage the guide <B>.
Push the front No. 2 console box insert in the direction indicated by the arrow (2) to engage the claw, 3 clips and guide <A> to install the front No. 2 console box insert.
-
INSTALL FRONT NO. 1 CONSOLE BOX INSERT
-
*a
Guide <A>
*b
Guide <B>
Push the front No. 1 console box insert in the direction indicated by the arrow (1) to engage the guide <B>.
Push the front No. 1 console box insert in the direction indicated by the arrow (2) to engage the claw, 3 clips and guide <A> to install the front No. 1 console box insert.
-
INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL