RADIO ANTENNA CORD INSTALLATION

PROCEDURE

  1. INSTALL ANTENNA CORD SUB-ASSEMBLY (for LHD)

    1. w/o Digital Audio Broadcasting:

      1. Attach the 7 clamps.

      2. Connect the connector.

      3. Install the antenna cord with the bolt.

        8.4 N*m

        85 kgf*cm

        73 in.*lbf

        B222486
    2. w/ Digital Audio Broadcasting:

      1. Attach the 7 clamps.

      2. Connect the connector.

      3. Install the antenna cord with the bolt.

        8.4 N*m

        85 kgf*cm

        73 in.*lbf

        E269314
  2. INSTALL ANTENNA CORD SUB-ASSEMBLY (for RHD)

    1. w/o Digital Audio Broadcasting:

      1. Attach the 7 clamps.

      2. Connect the connector.

      3. Install the antenna cord with the bolt.

        8.4 N*m

        85 kgf*cm

        73 in.*lbf

        B222488
    2. w/ Digital Audio Broadcasting:

      1. Attach the 7 clamps.

      2. Connect the connector.

      3. Install the antenna cord with the bolt.

        8.4 N*m

        85 kgf*cm

        73 in.*lbf

        E269315
  3. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY

  4. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY

    1. w/o Roof Sunshade System:

      1. Align the marking tape on the antenna cord with the roof headlining tab shown in the part of the illustration labeled A, and wrap tape around the cord to install it.

      2. Starting from the front of the vehicle, attach the antenna cord to the roof headlining with tape at the 11 marked locations labeled "a".

      3. While adjusting the slack of the antenna cord, attach the antenna cord to the roof headlining with tape at the marked location labeled "b".

      4. Set the antenna cord into the cutout of the roof headlining as shown in the part of the illustration labeled B.

        E269316E02
    2. w/ Roof Sunshade System:

      1. Align the marking tape on the antenna cord with the roof headlining tab shown in the part of the illustration labeled A, and wrap tape around the cord to install it.

      2. Starting from the front of the vehicle, attach the antenna cord to the roof headlining with tape at the 11 marked locations labeled "a".

      3. While adjusting the slack of the antenna cord, attach the antenna cord to the roof headlining with tape at the marked location labeled "b".

      4. Set the antenna cord into the cutout of the roof headlining as shown in the part of the illustration labeled B.

        E269317E02
  5. INSTALL ROOF HEADLINING ASSEMBLY

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  7. CHECK SRS WARNING LIGHT