OIL COOLER INSTALLATION

PROCEDURE

  1. INSTALL TRANSMISSION OIL COOLER

    1. Apply Toyota Genuine CVT Fluid FE to 2 new O-rings.

    2. Install the 2 O-rings to the transmission oil cooler.

    3. Install the transmission oil cooler to the transaxle case with the 3 bolts.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

  2. CONNECT NO. 5 WATER BY-PASS HOSE

    1. Connect the No. 5 water by-pass hose to the transmission oil cooler and slide the 2 clips to secure it.

      Note:

      Fully insert the No. 5 water by-pass hose to the 2nd rib on each oil cooler pipe.

  3. ADD ENGINE COOLANT (for 1ZR-FAE)

  4. ADD ENGINE COOLANT (for 8NR-FTS)

  5. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

  6. INSPECT FOR COOLANT LEAK (for 1ZR-FAE)

  7. INSPECT FOR COOLANT LEAK (for 8NR-FTS)

  8. INSPECT FOR FLUID LEAK

  9. INSTALL REAR ENGINE UNDER COVER LH (for 1ZR-FAE)

  10. INSTALL REAR ENGINE UNDER COVER LH (for 8NR-FTS)

  11. INSTALL NO. 1 ENGINE UNDER COVER (for 1ZR-FAE)

  12. INSTALL NO. 1 ENGINE UNDER COVER (for 8NR-FTS)