HEADLIGHT LEVELING ECU INSTALLATION

CAUTION / NOTICE / HINT

Tip:
  • Use the same procedure for RHD and LHD vehicles.

  • The procedure listed below is for LHD vehicles.

PROCEDURE

  1. INSTALL HEADLIGHT LEVELING ECU ASSEMBLY

    1. Install the headlight leveling ECU assembly with the bolt.

      8.0 N*m

      82 kgf*cm

      71 in.*lbf

    2. Connect the connector.

  2. INSTALL LOWER INSTRUMENT PANEL

  3. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY

  4. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click hereClick hereClick here

  5. INSTALL BATTERY SERVICE COVER

  6. INSTALL DECK BOARD ASSEMBLY

  7. CHECK SRS WARNING LIGHT

  8. INITIALIZE HEIGHT CONTROL SENSOR SIGNAL