STARTER (for 2.7 kW Type) INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. B007V7W

      for Automatic Transmission:

      Install the starter with the bolt and 2 nuts.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    2. B007VMZ

      for Manual Transmission:

      Install the starter with the bolt and nut.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    3. B007QWSE01

      Connect the wire harness to terminal 30 with the nut.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. Close the terminal cap.

    5. Connect the terminal 50 connector to the starter.

    6. B007V15E01

      for Wide Body:

      Install the wire ground cable with the bolt.

      Torque:
      25 N*m  { 250 kgf*cm, 18 ft.*lbf }
  2. INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET


    1. B007Q6F

      Install the No. 1 transmission control cable bracket onto the automatic transmission housing with the 2 bolts.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
  3. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. B007UJWE03

      Secure the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    2. Install the transmission control cable assembly onto the control shaft lever with the nut.

      Torque:
      15 N*m  { 150 kgf*cm, 11 ft.*lbf }
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  5. PERFORM INITIALIZATION


    1. Some system need initialization when reconnecting the battery cable. Click here