DRIVE BELT INSTALLATION
PROCEDURE
INSTALL FAN AND GENERATOR V BELT (w/ Air Conditioning System)
-
*a
4 mm Bi-hexagon Wrench
*b
Hole
Set the fan and generator V belt onto every pulley.
Attach a wrench to the hexagonal portion (A) of the V-ribbed belt tensioner assembly as shown in the illustration, and while rotating the V-ribbed belt tensioner assembly counterclockwise, remove the 4 mm bi-hexagon wrench.
Note:Check that the fan and generator V belt is properly set to each pulley.
-
INSTALL FAN AND GENERATOR V BELT (w/o Air Conditioning System)
Install the generator assembly with the 2 bolts.
42 N*m
428 kgf*cm
31 ft.*lbf
Connect the generator assembly connector.
Connect the wire harness to terminal B with the nut.
12 N*m
122 kgf*cm
9 ft.*lbf
Install the terminal cap.
Install the washer jar assembly with the 2 bolts.
5.5 N*m
56 kgf*cm
49 in.*lbf
Engage the 3 wire harness clamps to the washer jar assembly.
-
Set the fan and generator V belt on the generator pulley.
Set the SST on the crankshaft pulley.
0109-1
0109-1A
Set the fan and generator V belt on the SST as shown in the illustration.
Turn the crankshaft pulley counterclockwise until the fan and generator V belt is completely mounted on the crankshaft pulley and disengage the SST.
INSTALL HEADLIGHT ASSEMBLY RH (w/o Air Conditioning System)
CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL (w/o Air Conditioning System)
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.