DIESEL THROTTLE BODY INSTALLATION
PROCEDURE
INSTALL DIESEL THROTTLE BODY ASSEMBLY
Install a new gasket and the diesel throttle body assembly with the 2 nuts and 2 bolts.
11 N*m
112 kgf*cm
8 ft.*lbf
Connect the diesel throttle body assembly connector.
Connect the No. 6 water by-pass hose to the diesel throttle body assembly, and slide the clamp to secure the hose.
Connect the No. 7 water by-pass hose to the diesel throttle body assembly, and slide the clamp to secure the hose.
INSTALL NO. 3 AIR HOSE
-
*a
Front
*b
Left
*c
Upper
Install the No. 3 air hose to the No. 2 air tube and diesel throttle body assembly.
Note:Clean the outer surface of the pipe and the inner surface of the hose before connecting the parts.
Tighten the 2 hose clamps as shown in the illustration.
6.5 N*m
66 kgf*cm
58 in.*lbf
Tip:Make sure the direction of the hose clamps is asshown in the illustration.
-
ADD ENGINE COOLANT
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereClick hereClick hereClick hereClick hereClick here
INSPECT FOR COOLANT LEAK
INSTALL NO. 1 ENGINE UNDER COVER
INSTALL NO. 1 ENGINE COVER
PERFORM THROTTLE VALVE FULLY CLOSED POSITION LEARNING
Tip:Be sure to turn off the ignition switch before performing this inspection.
Turn the ignition switch to ON.
Turn the ignition switch off and wait 30 seconds.
Tip:The fully closed position of the diesel throttle valve is learned when the ignition switch is turned off.