BATTERY SMART UNIT INSTALLATION

PROCEDURE


  1. INSTALL BATTERY SMART UNIT

    CAUTION:

    Wear insulated gloves.


    1. Install the battery smart unit with the 2 nuts to the No. 2 hybrid vehicle battery cover panel LH.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  2. INSTALL NO. 2 HYBRID VEHICLE BATTERY COVER PANEL LH

    CAUTION:

    Wear insulated gloves.


    1. A005B3ZE03

      Install the No. 2 hybrid vehicle battery cover panel LH with the 5 bolts.

      Torque:
      Bolt A
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
      Bolt B
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
    2. Connect the 2 connectors.

  3. INSTALL NO. 1 HYBRID BATTERY SHIELD SUB-ASSEMBLY

    Click here

  4. INSTALL CONSOLE BOX ASSEMBLY

    Click here

  5. INSTALL FRONT NO. 2 CONSOLE BOX INSERT

    Click here

  6. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

    Click here

  7. INSTALL CENTER FLOOR CARPET COVER RH

    Click here

  8. INSTALL CENTER FLOOR CARPET COVER LH

    Click here

  9. INSTALL SERVICE PLUG GRIP

    Click here