ECM INSTALLATION

PROCEDURE

  1. INSTALL NO. 2 ECM BRACKET

    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      3.0 N*m

      31 kgf*cm

      27 in.*lbf

  2. INSTALL NO. 1 ECM BRACKET

    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      3.0 N*m

      31 kgf*cm

      27 in.*lbf

  3. INSTALL ECM

    1. Install the ECM with the 2 bolts.

      8.0 N*m

      82 kgf*cm

      71 in.*lbf

      Note:

      If the ECM has been struck or dropped, replace it.

    2. A321698C01

      *A

      for LHD

      *B

      for RHD

      Engage the wire harness clamp. (for LHD)

    3. Connect the 2 ECM connectors and lower the 2 levers.

      Note:
      • When connecting the ECM connectors, make sure that dirt, water or other foreign matter does not contact the connecting parts of the ECM connectors.

      • Be sure to securely connect the ECM connectors.

  4. INSTALL BATTERY CLAMP SUB-ASSEMBLY (for RHD)

  5. INSTALL BATTERY (for RHD)

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click hereClick here

  7. PERFORM INITIALIZATION