СВЕЧА НАКАЛИВАНИЯ УСТАНОВКА


  1. INSTALL GLOW PLUG ASSEMBLY


    1. A01DWQX

      Using a 12 mm deep socket wrench, install the 4 glow plugs.

      Torque:
      13 N*m  { 130 kgf*cm, 10 ft.*lbf }
  2. INSTALL NO. 1 GLOW PLUG CONNECTOR


    1. Install the glow plug connector by uniformly tightening the 4 nuts.

      Torque:
      1.0 N*m  { 10 kgf*cm, 9 in.*lbf }
    2. Install the 4 screw grommets.

    3. Install the wire harness with the nut.

      Torque:
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
  3. INSTALL INTAKE PIPE ASSEMBLY


    1. A01E109

      Install the intake pipe with the 2 bolts.

      Torque:
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }
    2. Tighten the 2 intake pipe clamps.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  5. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.