CAMSHAFT OIL CONTROL VALVE INSTALLATION

PROCEDURE

  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

    1. Apply a light coat of engine oil to a new O-ring and install the O-ring to the camshaft timing oil control valve assembly.

      Note:

      Do not damage the O-ring when installing.

      Tip:

      An O-ring is already installed in a new camshaft timing oil control valve assembly. So, the O-ring only needs to be coated with engine oil when the assembly is replaced with a new one.

    2. Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly with the bolt.

      10 N*m

      102 kgf*cm

      7 ft.*lbf

      Note:
      • Replace with a new part if it is dropped or if it receives a strong impact.

      • Make sure that the O-ring is not cracked or jammed when installing.

    3. Connect the camshaft timing oil control valve assembly connector.

  2. INSPECT FOR OIL LEAK

  3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY