PARK / NEUTRAL POSITION SWITCH INSTALLATION

PROCEDURE

  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY

    1. Move the shift lever to N.

    2. Temporarily install the park/neutral position switch assembly to the transaxle case with the 2 bolts.

    3. Install the lock plate and lock nut to the park/neutral position switch assembly.

      6.9 N*m

      70 kgf*cm

      61 in.*lbf

    4. Temporarily install the control shaft lever to the park/neutral position switch assembly.

    5. C310228C01

      *a

      P Position

      *b

      N Position

      Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.

    6. Remove the control shaft lever from the park/neutral position switch assembly.

    7. C154976C03

      *a

      Neutral Basic Line

      *b

      Protrusion

      Align the protrusion with the neutral basic line.

    8. Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.

      5.4 N*m

      55 kgf*cm

      48 in.*lbf

    9. C154977

      Using a screwdriver, bend down the tabs of the lock plate.

    10. Install the control shaft lever to the park/neutral position switch assembly with the washer and nut.

      12.7 N*m

      130 kgf*cm

      9 ft.*lbf

    11. Connect the park/neutral position switch assembly connector.

  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

    1. Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    2. Connect the transmission control cable assembly to the control shaft lever with the nut.

      12 N*m

      122 kgf*cm

      9 ft.*lbf

      Note:

      Before connecting the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in neutral.

  3. INSPECT SHIFT LEVER POSITION (for TMMT Made)

  4. INSPECT SHIFT LEVER POSITION (for TMUK Made)

  5. ADJUST SHIFT LEVER POSITION (for TMMT Made)

  6. ADJUST SHIFT LEVER POSITION (for TMUK Made)

  7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION

  8. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY

  9. INSTALL BATTERY CARRIER ASSEMBLY (for 1ZR-FAE)

  10. INSTALL BATTERY (for 1ZR-FAE)

  11. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ZR-FAE)

  12. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 8NR-FTS)

  13. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ZR-FAE)

  14. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE (for 8NR-FTS)

  15. INSTALL NO. 2 CYLINDER HEAD COVER (for 1ZR-FAE)

  16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for 1ZR-FAE)

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.