TRANSMISSION CONTROL CABLE INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Pass the transmission control cable assembly into the vehicle and install the transmission control cable assembly to the vehicle body with the 2 nuts.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    2. Connect the transmission control cable assembly to the vehicle body with the 2 nuts.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    3. Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    4. Connect the transmission control cable assembly to the transmission control shaft lever with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }

      Note

      Before installing the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in N.

  2. INSTALL NO. 1 CONSOLE BOX DUCT


    1. Install the No. 1 console box duct.

  3. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY

    Click here

  4. INSTALL FRONT LOWER NO. 1 FLOOR HEAT INSULATOR


    1. Install the front lower No. 1 floor heat insulator to the vehicle body with the 2 nuts.

      Torque:
      4.9 N*m  { 50 kgf*cm, 43 in.*lbf }
  5. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)

    Click here

  6. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  7. INSTALL ECM

    Click here

  8. INSTALL BATTERY

    Click here

  9. INSPECT SHIFT LEVER POSITION

    Click here

  10. ADJUST SHIFT LEVER POSITION

    Click here