ЭБУ НАСОСА ПОДАЧИ МОЧЕВИНЫ УСТАНОВКА


  1. INSTALL NO. 3 UREA PUMP CONTROL BRACKET


    1. Install the No. 3 urea pump control bracket to the urea pump control ECU with the 2 bolts.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  2. INSTALL NO. 4 UREA PUMP CONTROL BRACKET


    1. Attach the 3 claws and install the No. 4 urea pump control bracket to the No. 3 urea pump control bracket.

  3. INSTALL NO. 2 UREA PUMP CONTROL BRACKET


    1. Install the No. 2 urea pump control bracket to the No. 3 urea pump control bracket with the 2 bolts.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  4. INSTALL UREA PUMP CONTROL ECU


    1. Install the urea pump control ECU to the body with the 2 bolts.

      Torque:
      44 N*m  { 447 kgf*cm, 32 ft.*lbf }
    2. B007QNV

      Connect the connector to the urea pump control ECU.

      Note

      When connecting a connector, make sure that dirt, water and other foreign matter is not stuck between the connector and urea pump control ECU.

  5. INSTALL NO. 1 UREA PUMP CONTROL BRACKET


    1. Attach the 3 claws and install the No. 1 urea pump control bracket to the No. 3 urea pump control bracket and No. 4 urea pump control bracket.

  6. INSTALL RADIATOR ASSEMBLY

    Click here