POWER STEERING ECU INSTALLATION
CAUTION / NOTICE / HINT
Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
PROCEDURE
INSTALL POWER STEERING ECU ASSEMBLY
Install the power steering ECU assembly with 2 new bolts.
20 N*m
204 kgf*cm
15 ft.*lbf
Install 3 new terminal bolts.
3.2 N*m
33 kgf*cm
28 in.*lbf
Connect the 2 connectors and 2 harness clamps, and install a new ECU wire sub-assembly to the power steering ECU.
Install 2 new power steering ECU protectors to the power steering ECU assembly.
INSTALL ELECTRIC POWER STEERING COLUMN SUB-ASSEMBLY
INSTALL UPPER INSTRUMENT PANEL
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click hereClick hereClick hereClick hereClick hereClick here).
CHECK SRS WARNING LIGHT
w/ Occupant Classification System:Click here
w/o Occupant Classification System:Click here
ASSIST MAP WRITING