STARTER(for 1.7 kW Type) REASSEMBLY
PROCEDURE
INSTALL PLANETARY GEAR
-

High-temperature grease
Apply high-temperature grease to the planetary gears and pin parts of the planetary shaft.
Install the 3 planetary gears to the repair service starter kit.
-
INSTALL STARTER ARMATURE ASSEMBLY
-

High-temperature grease
Apply high-temperature grease to the washer and starter armature shaft.
Install the starter armature assembly to the starter commutator end frame assembly.
Using snap ring pliers, install the washer and a new snap ring.
Note:Be sure to install the snap ring in the armature shaft groove securely.
Be sure to install the snap ring properly because it easily expands.
-
*1
Length
Using a vernier caliper, measure the snap ring.
Maximum length
5.0 mm (0.197 in.)
If the length is more than the maximum, replace the snap ring with a new one.
-
INSTALL STARTER COMMUTATOR END FRAME COVER
-
Install the starter commutator end frame cover to the starter commutator end frame assembly.
-
INSTALL STARTER ARMATURE PLATE
*1
Key
*2
Keyway
Align the key of the starter armature plate with the keyway inside the starter yoke assembly, and install the starter armature plate.
INSTALL STARTER COMMUTATOR END FRAME ASSEMBLY
-
*1
Rubber Part
*2
Cutout
Align the rubber part on the starter commutator end frame with the cutout of the starter yoke assembly.
Install the starter commutator end frame assembly to the starter yoke assembly.
Note:The magnet of the starter yoke assembly may attract the starter armature assembly when the starter commutator end frame assembly is installed, causing the magnet to break.
-
INSTALL STARTER YOKE ASSEMBLY
-
*1
Cutout
*2
Protrusion
Align the protrusion of the starter yoke assembly with the cutout of the repair service starter kit.
Install the starter yoke assembly with the 2 through bolts.
6.0 N*m
61 kgf*cm
53 in.*lbf
-
INSTALL MOTOR TERMINAL STARTER KIT
-
Apply high-temperature grease to the plunger, return spring and hook.
Hang the plunger hook of the motor terminal starter kit on the drive lever hook.
Install the plunger and return spring.
Install the motor terminal starter kit with the 2 screws.
7.5 N*m
76 kgf*cm
66 in.*lbf
Connect the lead wire to terminal C with the nut.
10 N*m
102 kgf*cm
7 ft.*lbf
-