OIL PRESSURE SWITCHING VALVE REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during oil pressure switching valve assembly removal/installation are shown below.

Necessary Procedures After Parts Removed/Installed/Replaced
Replaced Part or Performed Procedure Necessary Procedure Effect/Inoperative Function when Necessary Procedure not Performed Link

  • Replacement of air fuel ratio sensor

  • Gas leak from exhaust system is repaired

Inspection After Repair
  • Poor idle, etc.

  • Engine start function, etc.

Click here

PROCEDURE


  1. REMOVE TURBOCHARGER SUB-ASSEMBLY

    Click here

  2. REMOVE ENGINE OIL LEVEL DIPSTICK GUIDE

    Click here

  3. REMOVE NO. 3 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  4. REMOVE NO. 4 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  5. REMOVE NO. 1 WATER BY-PASS PIPE

    Click here

  6. REMOVE OIL PRESSURE SWITCHING VALVE ASSEMBLY


    1. B007YLY

      Remove the bolt and oil pressure switching valve assembly from the water inlet housing.