ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the ECM with the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    2. Install the 2 wire harness clamps.

    3. Connect the 2 ECM connectors.


      1. A005CKS

        Connect the 2 ECM connectors and lower the 2 levers.

        Note


        • When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

        • Make sure that the 2 levers are securely locked.

      2. Install the 2 wire harness clamps.

    4. Install the No. 2 engine room wire with the bolt.

      Torque:
      8.3 N*m  { 85 kgf*cm, 73 in.*lbf }
    5. A005EZM

      Slide the side cover down and engage the 2 claws to install it.

    6. A005DKB

      Slide the engine room wire harness down and engage the 2 claws to install it.

    7. Connect the 3 wire harness connectors.

    8. Install the No. 1 relay block cover.

  2. INSTALL INVERTER RESERVE TANK ASSEMBLY


    1. Install the inverter reserve tank assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL INVERTER WITH CONVERTER ASSEMBLY

    Click here

  4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

  5. INSTALL DECK FLOOR BOX RH

    Click here

  6. INSTALL REAR DECK FLOOR BOX

    Click here

  7. INSTALL NO. 2 DECK BOARD

    Click here

  8. INSTALL NO. 1 DECK BOARD

    Click here

  9. INSTALL DECK BOARD ASSEMBLY

    Click here

  10. PERFORM INITIALIZATION

    Note


    • Perform Initialization when replacing the ECM Click here.

    • When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.