ECM INSTALLATION

CAUTION / NOTICE / HINT

Note

If the ECM has been struck or dropped, replace it.

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 bolts.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 bolts.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

  3. INSTALL ECM


    1. Install the ECM with the bolt and nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. B006FQLC01
      *A for RHD
      *B for LHD

      Connect the 2 ECM connectors.

      Note


      • When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other parts.

      • Make sure that the 2 levers are securely locked.

  4. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here