DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.
DRAIN ENGINE COOLANT
REMOVE DIESEL THROTTLE BODY ASSEMBLY
Remove the diesel throttle body Click here.
DISCONNECT NO. 3 WATER BY-PASS HOSE
Remove the clamp.
Disconnect the No. 3 water by-pass hose from the EGR cooler.
DISCONNECT NO. 4 WATER BY-PASS HOSE
Disconnect the No. 4 water by-pass hose from the EGR cooler.
REMOVE INJECTION PIPE
Remove the No. 1 to 3 injection pipe Click here.
REMOVE VENTURI BRACKET
Remove the 3 bolts and venturi bracket.
DISCONNECT NO. 3 WATER BY-PASS PIPE
Remove the 2 bolts and disconnect the No. 3 water by-pass pipe with wire harness.
REMOVE ELECTRIC VACUUM REGULATING VALVE ASSEMBLY
Disconnect the 2 connectors from the electric EGR control valve and E-VRV.
Disconnect the 5 vacuum hoses.
Remove the bolt and gas filter with the gas filter bracket.
Remove the 2 bolts and E-VRV's bracket with EGR vacuum damper.
REMOVE NO. 2 INTAKE AIR CONNECTOR
Remove the 3 nuts, No. 2 intake air connector and gasket.
REMOVE INTAKE AIR CONNECTOR
Remove the 3 bolts, intake air connector and 2 gaskets.
REMOVE ELECTRIC EGR CONTROL VALVE WITH NO. 2 EGR VALVE AND EGR COOLER
Disconnect the vacuum hose from the No. 2 EGR valve.
Remove the bolt, 2 nuts, electric EGR control valve with the No. 2 EGR valve and EGR cooler.
Remove the gasket from the cylinder block.
REMOVE ELECTRIC EGR CONTROL VALVE ASSEMBLY
Remove the 2 bolts, electric EGR control valve and gasket.
REMOVE EGR VALVE ADAPTER
Using a 6 mm hexagon wrench, remove the 3 hexagon bolts, 3 plate washers, EGR valve adapter and gasket.
REMOVE NO. 2 EGR VALVE ASSEMBLY
Using a 5 mm hexagon wrench, remove the hexagon bolt, No. 2 EGR valve and gasket.