INTERCOOLER INSTALLATION
PROCEDURE
INSTALL INTERCOOLER ASSEMBLY
Install the intercooler assembly with the 4 bolts.
7.0 N*m
71 kgf*cm
62 in.*lbf
INSTALL LOWER RADIATOR SUPPORT SUB-ASSEMBLY RH
Install the lower radiator support sub-assembly RH with the 2 bolts.
7.0 N*m
71 kgf*cm
62 in.*lbf
INSTALL LOWER RADIATOR SUPPORT SUB-ASSEMBLY LH
Install the lower radiator support sub-assembly LH with the 2 bolts.
7.0 N*m
71 kgf*cm
62 in.*lbf
INSTALL NO. 2 AIR TUBE
INSTALL RADIATOR ASSEMBLY
CONNECT NO. 2 RADIATOR HOSE
CONNECT NO. 3 RADIATOR HOSE
INSTALL NO. 3 AIR HOSE
INSTALL INTERCOOLER AIR HOSE
CONNECT NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY
INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY
CONNECT NO. 1 WATER HOSE CLAMP BRACKET
CONNECT NO. 3 WATER BY-PASS HOSE
INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY LH
INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY RH
INSTALL RADIATOR SUPPORT LH
INSTALL RADIATOR SUPPORT RH
INSTALL RADIATOR SUPPORT TO CROSS MEMBER BRACE SUB-ASSEMBLY
INSTALL NO. 3 RADIATOR AIR GUIDE
INSTALL NO. 1 RADIATOR AIR GUIDE LH
INSTALL NO. 1 RADIATOR AIR GUIDE RH
INSTALL INJECTOR DRIVER
INSTALL BATTERY CARRIER BRACKET SUB-ASSEMBLY
INSTALL BATTERY
INSTALL THERMISTOR ASSEMBLY
INSTALL FRONT BUMPER REINFORCEMENT SUB-ASSEMBLY
INSTALL FRONT BUMPER ENERGY ABSORBER
INSTALL HEADLIGHT ASSEMBLY LH
INSTALL HEADLIGHT ASSEMBLY RH
Tip:Use the same procedures for the RH side and LH side.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSTALL NO. 1 ENGINE UNDER COVER