FRONT PROPELLER SHAFT ASSEMBLY INSPECTION

PROCEDURE

  1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY

    1. C258371

      Using a dial indicator, check the propeller shaft runout.

      Maximum runout

      0.3 mm (0.0118 in.)

      If the shaft runout is more than the maximum, replace the propeller shaft.

  2. INSPECT FRONT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING

    1. Check the spider bearings for wear or damage.

      If necessary, replace the spider bearing.

    2. C172298

      Check the spider bearing axial play by turning the yoke while holding the shaft tightly.

      Maximum bearing axial play

      0 mm (0 in.)

      If the axial play is more than the maximum, replace the spider bearing.