SHIFT LEVER ASSEMBLY INSTALLATION

PROCEDURE

  1. INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY

    1. Install the floor shift shift lever assembly with the 4 bolts.

      12 N*m

      122 kgf*cm

      9 ft.*lbf

    2. for LHD:

      1. Attach the 2 wire harness clamps.

    3. for RHD:

      1. Attach the 3 wire harness clamps.

  2. CONNECT TRANSAXLE CONTROL CABLE ASSEMBLY

  3. ADJUST TRANSAXLE CONTROL CABLE ASSEMBLY

    1. Adjust control cable.

      Click here

    2. For new shift lever:

      Remove the stopper pin and dispose of it.

  4. INSTALL REAR CONSOLE BOX SUB-ASSEMBLY