STARTER INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      46 N*m  { 469 kgf*cm, 34 ft.*lbf }
    2. Connect the starter assembly connector.

    3. Connect terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Install the terminal cap.

    5. Connect the wire harness with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  3. INSTALL ECM

    Click here

  4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

    Click here

  5. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  6. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  7. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here

  8. INSTALL BATTERY

    Click here