NETWORK GATEWAY ECU(for LHD) INSTALLATION

PROCEDURE

  1. INSTALL NETWORK GATEWAY ECU

    1. Install the network gateway ECU with the bolt.

      12 N*m

      122 kgf*cm

      9 ft.*lbf

    2. Connect the connector.

  2. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  4. PERFORM DIAGNOSTIC SYSTEM CHECK

  5. CHECK SRS WARNING LIGHT