STARTER(w/ Stop And Start System) INSTALLATION

PROCEDURE

  1. INSTALL STARTER ASSEMBLY

    1. Install the starter assembly with the 2 bolts.

      64 N*m

      653 kgf*cm

      47 ft.*lbf

    2. Install the starter wire with the nut.

      9.8 N*m

      100 kgf*cm

      87 in.*lbf

    3. Close the terminal cap.

    4. Connect the starter connector.

  2. INSTALL NO. 3 AIR HOSE

  3. INSTALL NO. 1 AIR TUBE

    1. Install the No. 1 air tube with the 2 bolts.

      24 N*m

      245 kgf*cm

      18 ft.*lbf

    2. Tighten the 2 clamps.

      6.5 N*m

      66 kgf*cm

      58 in.*lbf

    3. Attach the 2 wire harness clamps.

    4. Install the bolt and attach the wire harness clamp.

      7.7 N*m

      79 kgf*cm

      68 in.*lbf

  4. INSTALL AIR CLEANER BRACKET

  5. CONNECT FUEL FILTER ASSEMBLY

    1. Connect the fuel filter assembly with the bolt.

      7.0 N*m

      71 kgf*cm

      62 in.*lbf

  6. INSTALL AIR CLEANER SUPPORT

  7. INSTALL AIR CLEANER CASE

  8. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  9. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  10. INSTALL BATTERY BRACKET REINFORCEMENT

  11. INSTALL FRONT BATTERY BRACKET

  12. INSTALL BATTERY TRAY

  13. INSTALL BATTERY

  14. INSTALL BATTERY INSULATOR

  15. INSTALL BATTERY CLAMP SUB-ASSEMBLY

  16. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

  17. INSTALL NO. 1 ENGINE UNDER COVER

  18. INSTALL NO. 1 ENGINE COVER

  19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click hereClick hereClick here

  20. CLEAR NUMBER OF STARTER OPERATIONS