HEATER EXHAUST PIPE INSTALLATION
PROCEDURE
INSTALL NO. 1 EXHAUST PIPE SUB-ASSEMBLY
Install the 2 new gaskets to the No. 1 exhaust pipe sub-assembly.
Install the No. 1 exhaust pipe sub-assembly with the 2 bolts and nut.
for Bolt
9.8 N*m
100 kgf*cm
87 in.*lbf
for Nut
5.4 N*m
55 kgf*cm
48 in.*lbf
INSTALL NO. 2 EXHAUST PIPE SUB-ASSEMBLY